Products

Matrix Geo Max – Geothermal Drill Rod

This drill rod was developed specifically for the geothermal heat loop industry. The challenge was to design a drill rod that could differentiate itself in terms of speed of make-up and breakout, providing a distinct advantage to the user in terms of productivity per shift. Also, the drill rod had to be exceptionally durable and outlast the competition. The Matrix engineering team designed a unique heavy duty double start thread that accomplished both goals. Head to head testing and years of field experience conclusively show that our rod is a faster, longer wear life product.

  • "Huge shout out to the whole Matrix Team. We had some swivel issues and everyone at Matrix went way above and beyond the call of duty to help us get back up and going in record time. Thank you for the support and getting us up and rolling"

    Rosenlund Drilling